Installation Of Manual Extension Rod Soft Sealing Butterfly Valve
Installation:
Preparation: Before starting the installation, ensure you have the correct valve, extension rod, and necessary tools.
Safety First: Always follow safety guidelines and use appropriate personal protective equipment (PPE) when working with valves.
Valve Inspection: Inspect the valve and extension rod for any visible damage or defects. Ensure they are suitable for the intended application.
Positioning: Position the valve and extension rod at the desired location in the pipeline. Ensure there is enough clearance around the valve for easy operation and maintenance.
Alignment: Properly align the valve and extension rod with the pipeline. Misalignment can lead to operational issues and premature wear.
Bolting: Use the correct bolts and nuts to secure the valve flanges to the pipeline flanges. Tighten the bolts evenly to the recommended torque values.
Gasket Installation: Place a new gasket between the valve flanges and the pipeline flanges to ensure a leak-tight seal.
Operational Check: After installation, operate the valve through the extension rod to ensure it moves freely without any obstructions.